Exit 143 - Uintah Street aerial picture
This exit, along with the Fontanero St. exit, were recently rehabbed. I-25 is currently striped as 2 lanes plus an auxillary lane in each directioin. In order to make this section of the I fully three lanes in each direction, the entrance and exit ramp areas need to be restriped and the overhead signs need to be shifted. 'Nuff said.
Live Camera at the pedestrian bridge between exits 142 and 143
Live camera of the interchange. Camera shots courtesy springsgov.com
Original pictures - taken April 2005
- Original shot
Northbound 25 after Uintah. Typical of what the interstate will look like when complete.
- Original shot
Southbound approaching Uintah. Dig that crazy "Exit Only" racing stripe...
- Original shot
Note how the southbound sound wall continues over Uintah Street.
- Original shot
This pedestrian bridge is also seen in the graphic on the top of the CDOT Pages.
- Original shot
Here's a shot of what the exisiting sound walls look like from the back.
- 7/5/05
These Alternate Route lights were installed a few years back. Most of them in the city are still covered.
- Original shot
Eastbound on Uintah at 25. The railroad bridge after 25 has a clearance of 12'6".
- 7/5/05
A close up of the railroad bridge. This is not part of COSMIX, but it's still cool. The black sign is an original.
- Where to next?
- Bijou Street
- COSMIX Home
- Exit 144
Disclaimer: This website is not affiliated with the COSMIX Project or the Colorado Department of Transportation. All pictures contained on this site are solely the property of Ryan Wanner unless otherwise specified. Copying/distributing these pictures without my authorization is going to put me in a pretty bad mood, and you don't want to see that, trust me. Linking to this site is more than welcome, but let me know so that I can return the favor. That is all, have a good day, k?--Ryan
Additional links you may find handy... Sitemap ... RSS Feed information