Exit 145 - SH38/Fillmore Street aerial picture
This exit is where I-25 bottlenecks to two lanes when heading northbound. This, along with an impossibly short acceleration lane northbound, leads to some hefty backups during the PM rush hour. North of this interchange is a bridge over Ellston street which will either be rehabbed or replaced. New pictures have a grey background under the caption.
Live camera of the interchange
Original Pictures - taken April 2005 - open
- Original shot
Northbound. Goodbye lane 3, hello FREAKING HUGE SH 38 shield.
- Original shot
The traffic sensor to the right of the roadway is here because of the heavy backups this stretch sees.
- Original shot
Multiple skidmarks: bad. 500 foot acceleration lane: worse.
- Original shot
Southbound at Fillmore. The frontage road shares the same intersection with the offramp.
- Original shot
Wider shoulder than usual here. The road will be restriped to a 3+1 configuration during COSMIX.
- 7/5/05
Eastbound on Fillmore approaching I-25. Fillmore descends a 9% grade immediately before the interstate.
- 7/5/05
Any wonder why Colorado Springs was rated extremely high in a "worst traffic for a city of its size" survey?
- 7/5/05
Eastbound Fillmore's intersection with SB 25. Any questions to where the exit for NB 25 is?
Construction Pictures: newest to oldest
Current update
- 9/13/06
With the restriping of the lanes between Fontanero and Fillmore done, we now get a closure of the left lane. This confuses more drivers than I care to admit.
- 9/13/06
A little tip from r-dub: since everyone's still used to this lane having to exit, noone uses it and just backs up the middle lane. Stay right, and you'll be better off!
- 8/30/06
The new lanes now match up with the old.
- 8/30/06
From new asphalt to old cement. That truck (and us shortly) is driving where no traffic has been before on this cement.
- 8/30/06
The Fillmore merge lane is now striped as an auxillary lane all the way to Fontanero.
- 8/23/06
Approaching Fillmore. The left lane, while paved and ready, isn't open to allow for median work.
- 8/23/06
The Holland Park noise wall along the frontage road (Sinton Street) is now complete. This wall is quite smaller than the one directly alongside the interstate.
- 8/23/06
Cable-stay guardrail has been placed in the median between Fillmore and Garden of the Gods.
- 8/23/06
Crews working hard at getting the cable-stay rail installed.
- 8/17/06
Approaching Fillmore from the south. Median work is on the menu today, I see.
- 8/17/06
The median work is pretty simple today: install cement bases for the cable-stay guardrails that will be installed here.
Recent updates
- 05/11/06
Taking work along with him.
- 05/23/06
Looking northbound from atop the Fillmore Street bridge.
- 02/23/06
Since the whole Nevada Ave. wasn't closed (look ahead 2 pics), the crews updated the sign. Still that crappy font, tho.
- 02/07/06
All of the cement barricades have been removed. Once weather is warm again, this will be striped for 3 lanes.
- 01/24/06
A new sign awaits us just after the Fillmore onramp heading north.
- 01/24/06
The temporary barriers from southbound 25 have been removed from Ellston to Fillmore.
- 01/24/06
Fencing on the west side of the interstate has been completed. This is taken on Chestnut.
2005 Construction Pictures
- Where to next?
- Uintah Street
- COSMIX Home
- Ellston Street
Disclaimer: This website is not affiliated with the COSMIX Project or the Colorado Department of Transportation. All pictures contained on this site are solely the property of Ryan Wanner unless otherwise specified. Copying/distributing these pictures without my authorization is going to put me in a pretty bad mood, and you don't want to see that, trust me. Linking to this site is more than welcome, but let me know so that I can return the favor. That is all, have a good day, k?--Ryan
Additional links you may find handy... Sitemap ... RSS Feed information