This exit is only accessable from the southbound lanes of the interstate. It's an interesting exit. For lack of a better word, it's its own C/D exit. You exit from the exit ramp to get to Corporate Centre Drive. Theoretically, this makes a good bypass of slower drivers on the mainline. (Not that I've ever done that.....) This page also has all of the pictures for the new crossings over Monument Creek, both the mainline bridges and the collector/distributor roadways.

Original pictures - taken April 2005 - open

  • Wall
    Original shot

    On Corp Centre Drive close to the Woodmen exit. The metal railing used here is normally only used on bridges.

  • Corporate Centre Exit
    Original shot

    The Corporate Centre exit veers off to the right here. There is a lane there, it just hasn't been striped in a while.

  • Corporate Centre onramp
    Original shot

    Entering SB 25. The cars are on mainline 25, the grey line below the cars is the C/D road.

  • Corp merge
    Original shot

    Mainline 25 South approaching the Corp Centre merge.

  • 07050523
    7/5/05

    To get onto I-25 from Corporate Centre, you must hang a left (if going southbound) here.

  • 07050524
    7/5/05

    Here's the current end of Corporate Centre. Colorado Springs will extend this road to the new Nevada/25 interchange.

  • 07050525
    7/5/05

    Back on the merge lane, we're approaching mainline 25.

  • 07050526
    7/5/05

    Going over Monument Creek. The next picture is this same bridge from the path below it.

  • Creek path
    Original shot

    This was taken on the path alongside Monument Creek. The southbound bridge is in the foreground.

  • Southbound bridge
    Original shot

    Looking back at the southbound bridge, we can see some of the damage this bridge has.

  • BNridge close up
    Original shot

    Close up of the southbound bridge supports

  • Northbound bridge
    Original shot

    Under the northbound lanes facing the same direction as traffic. Lane 3 was added in the late 80's.

  • Creek path
    Original shot

    Northbound bridge supports.

2005 Construction Pictures

2006 Construction Pictures: newest to oldest

Current Update
  • 09130619
    9/13/06

    Northbound traffic is back on the new C/D road over Monument Creek, and crews are working hard at the new pillars.

  • 09130620
    9/13/06

    Looking at the work zone. The pillars will be where the retaining walls will be installed.

  • 09130622
    9/13/06

    Looking northwest at the new retaining walls. We're right over where Nevada will intersect the interstate, and the road we see curving off in the distance is the Corporate Centre extension.

  • 09130644
    9/13/06

    Crews are working hard in the median today.

  • 09130651
    9/13/06

    On the C/D bridge over Monument Creek headed southbound.

  • 09130652
    9/13/06

    That backhoe is right where the old southbound bridge used to be. I think we'll need to check this out.

  • 09130668
    9/13/06

    Now on the Pikes Peak Greenway Trail approaching the bridge construction/destruction area.

  • 09130669
    9/13/06

    Yup. The former southbound bridge is slowly being dismantled.

  • 09130670
    9/13/06

    Look closely in the shadow of the near bridge: there's a worker there catching some z's on his break.

  • 09130671
    9/13/06

    The old bridge is still intact in places and piles of rubble in other places.

  • 09130672
    9/13/06

    Cleaning up the mess the old bridge's demolition left behind. Crews didn't waste any time here: this bridge was here 4 days ago.

  • 09130673
    9/13/06

    Piles of rubble and pillars, anyone?

  • 09130674
    9/13/06

    A platform for installation of the new girders?

  • 09130675
    9/13/06

    Chiseling out the old concrete landing point of the old southbound bridge.

  • 09130676
    9/13/06

    I have a new favorite shot of the COSMIX series. I should submit this one to SEMA Constructors.

  • 09130677
    9/13/06

    Another shot of old dwarfed by new.

  • 09130678
    9/13/06

    I was actually a little worried about the operator swinging the crane around and hitting me just after I took this pic.

  • 09130679
    9/13/06

    A shot of the junk that the crane operator is dealing with.

  • 09130680
    9/13/06

    Old versus new, take 2. This shot shows how old lost here.

  • 08300615
    8/30/06

    Approaching the construction zone from the trail. We can see that the traffic has been shifted.

  • 08300616
    8/30/06

    The northbound traffic has been placed onto the former southbound bridge.

  • 08300617
    8/30/06

    Walls are going up at the far end of the creek area now. That wall will eventually be where the bridge over Nevada Avenue starts.

  • 08300618
    8/30/06

    It's odd to me seeing traffic moving this direction. I'm just not used to it.

  • 08300619
    8/30/06

    Looking along the new C/D bridge in the opposite direction of traffic flow.

  • 08300620
    8/30/06

    A closer shot of the construction of a retaining wall and a shot of some erosion damage.

  • 08300620
    8/30/06

    A shot of the progress of the COrporate Centre Drive extension. Note that the construction vehicles are using the hotel's parking lot as their own driveway.

  • 08300623
    8/30/06

    Now I'm convinced we have a new ghost ramp in the city. At the end of the asphalt is a nice, gentle slope down to the new lanes.

  • 08300640
    8/30/06

    Approaching where the Corporate Centre offramp used to be.

  • 08300642
    8/30/06

    Coming up on the new intersection for Nevada/Corp Centre drive. Remember, we're using the new C/D road offramp right now.

  • 08300644
    8/30/06

    About to head over Monument Creek.

  • 08280617
    8/28/06

    Continuing the northbound detour onto the old southbound lanes from the Rockrimmon page.

  • 08280618
    8/28/06

    Heading over Monument Creek while traveling north in the old southbound lanes. You get a sense of how low this bridge is when you see the new one here.

  • 08280619
    8/28/06

    Approaching the next major construction area in the Nevada/Rockrimmon zone.

  • 08230644
    8/23/06

    After a few break-ins and other types of vandalism, crews thought it best to surround the cement plant with a fence. No word on if that's helping or not.

  • 08170618
    8/17/06

    The former ramp to I-25 is still there, and it shows no sign of going away. Are we seeing a ghost ramp in the making?

  • 08170619
    8/17/06

    The Corporate Centre extension is progressing nicely, I see.

  • 08170620
    8/17/06

    Most of the curbs have been poured now.

  • 08170621
    8/17/06

    Looking at the future intersection of the southbound C/D road and Corporate Centre Drive/Nevada Avenue.

  • 08170623
    8/17/06

    A little closer than the previous shot.

  • 08170626
    8/17/06

    Looking at the almost-complete box culvert design of the Corporate Centre extension.

  • 08170627
    8/17/06

    This seems to be all that's left until the box culvert is complete.

  • 08170628
    8/17/06

    Coming up on the bridges from the north while on the Pikes Peak Greenway Trail.

  • 08170629
    8/17/06

    Painting has started.

  • 08170630
    8/17/06

    Looking the same direction as northbound traffic heads.

  • 08170631
    8/17/06

    Looking past what's left of the old southbound lanes to the pillars which will support the mainline lanes.

  • 08170632
    8/17/06

    A big and little pipe are chillin' under the northbound C/D bridge.

  • 08170633
    8/17/06

    Crews have installed drain pipes. Shouldn't that be at a steeper slope to help prevent the draining water from icing up?

  • 08170634
    8/17/06

    Looking at the new southbound C/D road bridge and the continued construction on the mainline bridges.

  • 08170601
    8/17/06

    Another bridge construction shot.


Recent updates
  • 05110604
    05/11/06

    Crews left the add-on lane of the old southbound bridge over Monument Creek.

  • 05110605
    05/11/06

    Work erecting the new pillars continues.

  • 05110611
    05/11/06

    Heading southbound approaching the Monument Creek bridges.

  • 05230612
    05/23/06

    The extension of Corporate Centre is going to be over Monument Creek on a box culvert.

  • 05230613
    05/23/06

    I hope this will be closed off once it's complete. This would be the ideal homeless campground if not.

  • 05230614
    05/23/06

    Looking north along the Corporate Centre extension.

  • 05230615
    05/23/06

    Looking at the current end of the box culvert. This will eventually extend all the way to the interstate.

  • 05230616
    05/23/06

    Hello!!! Is anybody in there???

  • 05230617
    05/23/06

    Looking at the current south end of the culvert.

  • 05230618
    05/23/06

    Not a lot is happening under the interstate today. In fact, nothing is happening under the interstate today.

  • 05230619
    05/23/06

    The trail is detoured to right up against one of the old NB bridge pillars.

  • 05230620
    05/23/06

    Only two pillars have been poured since the old bridge came down. This is one of them.

  • 05230621
    05/23/06

    Big metal tube's just chillin' waiting for something to do.

  • 05230622
    05/23/06

    Looking north at the mainline construction area from under the NB C/D bridge.

  • 05230623
    05/23/06

    Another shot just here to demonstrate how blue the sky gets around these parts.

  • 05230636
    05/23/06

    Wow. Can't get there from here.

  • 03230610
    03/30/06

    Toy storage right next to the roadway.

  • 03230611
    03/30/06

    Working away.

  • 03230613
    03/30/06

    It's like driving through Stonehenge, I tell ya.

  • 03230614 title=
    03/30/06

    Another pillar shot.

  • 03230621
    03/30/06

    Scenic roadgeek shot here, I tells ya.

  • 03230607
    03/23/06

    The mainline pillars are starting to take shape.

  • 03230608
    03/23/06

    Closer shot of the construction.

  • 03230611
    03/23/06

    Construction traffic still utilizes the old ramps to the interstate... or at least where the I was.

  • 03230612
    03/23/06

    The Corp Centre extension is rolling right along.

  • 03230616
    03/23/06

    The construction has really narrowed this driveway.

  • 03230613 title=
    03/23/06

    Peeking in at the ongoing C/D construction

  • 03230615 title=
    03/23/06

    Zoom lenses are our friends.

  • 03230623 title=
    03/23/06

    Where the Corp Centre exit used to be at on SB 25.

  • 03230624
    03/23/06

    Where there was a Corp Centre merge lane now lies a pull off.

  • 03230629
    03/23/06

    Approaching the Monument Creek bridges on NB 25

  • 03230630
    03/23/06

    Closer in to the Monument Creek bridges.

  • 03230631 title=
    03/23/06

    The new mainline bridge will be significantly higher than the old SB bridge.

  • 03230632
    03/23/06

    Working right up to the edge of the existing bridge

  • 03230633 title=
    03/23/06

    Installing the concrete forms for these pillars.

  • 03230690
    03/23/06

    From the vantage point discovered last week now: Installing the concrete form.

  • 03230691
    03/23/06

    Looks like the pour happened just the way it should have.

  • 03230693
    03/23/06

    Showing the many levels of bridges and roadways, both new and old.

  • 03230698
    03/23/06

    "Trail Detour"? There's some interesting signs down here, I tell ya.

  • 03230699 title=
    03/23/06

    The detour just makes you walk in the mud, that's all.

  • 032306h01
    03/23/06

    A shot of the new pillar construction.

  • 032306h05
    03/23/06

    On the trail. Still open, but troublesome to walk or bike on.

  • 032306h06 title=
    03/23/06

    Looking up the columns.

  • 032306h02
    03/23/06

    More pillar goodness.

  • 032306h03
    03/23/06

    A concrete footer? What are they doing?.

  • 032306h04
    03/23/06

    This is a cool shot.

  • 02230605
    02/23/06

    On Corp. Centre looking at the construction progress.

  • 02230606
    02/23/06

    Still more construction goodness.

  • 02230608
    02/23/06

    From the parking lot at the current end of Corp. Centre looking at the northern edge of the SB C/D bridge.

  • 02230609
    02/23/06

    These blokes are working on the Corp. Centre extension.

  • 02230610
    02/23/06

    "Is that a hole? I think it's a hole!"

  • 02230616
    02/23/06

    A detour sign for this exit just before the Monument Creek bridges

  • 02230617
    02/23/06

    Closer to the bridges now. Lotsa activity today.

  • 02230618 title=
    02/23/06

    Looks like cement pour day today.

  • 02230619
    02/23/06

    Cement pouring goodness

  • 02230647
    02/23/06

    Now from the trail: as we see, the bridge railings on the NB C/D bridge are all but complete.

  • 02230648
    02/23/06

    The southern landing point of the NB C/D bridge.

  • 02230601
    02/23/06

    A look down the span

  • 02230650
    02/23/06

    Looking between the supports, as I have done in previous pics.

  • 02230651 title=
    02/23/06

    Old on the left, new on the right, looking the direction of traffic northbound.

  • 02230652
    02/23/06

    Looking at the southbound lanes from under the old NB bridge.

  • 02230653 title=
    02/23/06

    Activity happening between the NB and SB lanes, too.

  • 02230655 title=
    02/23/06

    A shot of the cement pump truck we saw from the interstate.

  • 02230656
    02/23/06

    Pouring on the bridge deck. The plastic is there to stop pedestrians from getting a bath.

  • 02230657
    02/23/06

    I love my new zoom lens!

  • 02230663
    02/23/06

    A new vantage point! This is the pour we saw from below in the last few pics.

  • 02230664
    02/23/06

    Have I mentioned that I really like the image quality of my new camera?

  • 02230665
    02/23/06

    At the southern end of the SB C/D road

  • 01240615
    01/24/06

    The parking lot of the hotel at the current end of Corp. Center is being removed for road expansion.

  • 01240628
    01/24/06

    Headed south on 25. The C/D bridge has girders now, too.

  • 01240629
    01/24/06

    Definitely higher than the original bridge.

  • 012406301
    01/24/06

    The landing point of the new bridge.

  • 01240619
    01/24/06

    Approaching the bridges from the north on the trail.

  • 01240620
    01/24/06

    The new bridges start to appear through the trees.

  • 01240621 title=
    01/24/06

    Getting closer to the bridges.

  • 01240622
    01/24/06

    Working on the expansion joints.

  • 01240626
    01/24/06

    Looking across the creek at the SB C/D bridge

  • 01240623
    01/24/06

    Here's a generator humming away.

  • 01240625
    01/24/06

    The new C/D bridge is significantly higher than the old bridges: the new mainline bridges will be even higher.

  • 01240644
    01/24/06

    Now approaching the construction site from the south, looking at the NB C/D bridge.

  • 01240652
    01/24/06

    This worker is attaching the catwalk to the bridge girder.

  • 01240647
    01/24/06

    Looking at the construction progress. The metal base is being installed today: this is a noisy area.

  • 01240648
    01/24/06

    The metal supports have slipped down on this pillar.

  • 01240649
    01/24/06

    Looking north(east) down the bridge.

  • 01160633
    01/16/06

    Headed southbound on I-25: activity continues on the SB C/D road.

  • 01160634
    01/16/06

    Just before the bridge over Monument Creek. We see the SB C/D road pillars await girder installation.

  • 01160635
    01/16/06

    On the Monument Creek bridge now.

  • 01160655
    01/16/06

    Approaching the bridge work from the Monument creek trail, heading north.

  • 01160664
    01/16/06

    Surveyors are keeping tabs on the new bridge installation.

  • 01160656
    01/16/06

    Bridge girders have been installed on the NB C/D road now.

  • 01160663
    01/16/06

    Getting closer to the new bridge.

  • 01160661
    01/16/06

    The southern start to the bridge.

  • 01160659 title=
    01/16/06

    Workers in action.

  • 01160662
    01/16/06

    Approaching the main worksite. This is still open to bicyclists and pedestrians through all of this.

  • 01160657
    01/16/06

    Looking down the length of the bridge.

  • 01160658 title=
    01/16/06

    Closer to the crane. I didn't use the zoom on my camera: I'm this close.

  • 01160660
    01/16/06

    Another shot down the length of the bridge.

2005 Construction Pictures

Section Links

Disclaimer: This website is not affiliated with the COSMIX Project or the Colorado Department of Transportation. All pictures contained on this site are solely the property of Ryan Wanner unless otherwise specified. Copying/distributing these pictures without my authorization is going to put me in a pretty bad mood, and you don't want to see that, trust me. Linking to this site is more than welcome, but let me know so that I can return the favor. That is all, have a good day, k?--Ryan

Additional links you may find handy... Sitemap ... RSS Feed information